Skip to content

System Integrity

At WRVEC, an accurate and dependable system is imperative to our success. Through maintaining a solid network and continually evaluating areas for growth, we are able to distribute some of the most reliable energy in the country.

Average Service Availability Index

To measure system performance, the electric utility industry developed the ASAI percentage. This calculation is complex, but involves the help of some other key indecies. This combined information gives WRVEC an average availability of 99.69%, meaning that the Cooperative is undoubtedly reliable and that our members receive dependable power nearly 100% of the time.

2024 System Projects

Our system’s reliability takes into account both planned maintenance and upgrades. Servicing what we already have in place and continually evaluating the network to meet growing demands means that we are dedicated to operating to the best of our abilities and above industry standards. These practices provide the most dependable service for our members.

For pole changeouts, inspections, and replacements, we contract with the following companies: Lee Inspections & BBC Electric.

Only WRVEC and above contractors are approved to work on your property. Any other person or company representative is not an authorized representative of the Cooperative. Please contact your local authorities if you suspect suspicious behavior.

The following projects are either under evaluation, in design, or are currently in progress:

PROJECT

Location

Meter Upgrades System Wide
Pole Inspections and Maintenance Rockaway, Goodhope, & Theodosia
Pole Replacements Theodosia, Wasola, Table Rock, Paradise, Clevenger Cove, & Rockaway
System Improvement Projects Bluewater (along Highway DD) , Lake (along Highway 13), Finley River Crossing, & Kimberling City (Feeder 2)